Adafin, Johnson, James O.B. Rotimi, and Suzanne Wilkinson. 2015. ‘Why Do the Design Stage Elemental Cost Plan and Final Tender Sum Differ in New Zealand?’ Journal of Financial Management of Property and Construction 20 (2): 116–31. https://doi.org/10.1108/JFMPC-08-2014-0016.
———. 2018. ‘Risk Impact Assessments in Project Budget Development: Quantity Surveyors’ Perspectives’. International Journal of Construction Management, April, 1–16. https://doi.org/10.1080/15623599.2018.1462441.
Ahmad, Zubair, Muhammad Jamaluddin Thaheem, and Ahsen Maqsoom. 2018. ‘Building Information Modeling as a Risk Transformer: An Evolutionary Insight into the Project Uncertainty’. Automation in Construction 92 (August): 103–19. https://doi.org/10.1016/j.autcon.2018.03.032.
Al Nahyan, Moza Tahnoon, Amrik Sohal, Yaser Hawas, and Brian Fildes. 2019. ‘Communication, Coordination, Decision-Making and Knowledge-Sharing: A Case Study in Construction Management’. Journal of Knowledge Management, January. https://doi.org/10.1108/JKM-08-2018-0503.
Alreshidi, Eissa, Monjur Mourshed, and Yacine Rezgui. 2017. ‘Factors for Effective BIM Governance’. Journal of Building Engineering 10 (March): 89–101. https://doi.org/10.1016/j.jobe.2017.02.006.
Arditi, David, Shruti Nayak, and Atilla Damci. 2017. ‘Effect of Organizational Culture on Delay in Construction’. International Journal of Project Management 35 (2): 136–47. https://doi.org/10.1016/j.ijproman.2016.10.018.
Bourne, Lynda, and Derek H.T. Walker. 2008. ‘Project Relationship Management and the Stakeholder CircleTM’. International Journal of Managing Projects in Business 1 (1): 125–30. https://doi.org/10.1108/17538370810846450.
Chang, Tengyuan, Bon-Gang Hwang, Xiaopeng Deng, and Xianbo Zhao. 2018. ‘Identifying Political Risk Management Strategies in International Construction Projects’. Advances in Civil Engineering 2018 (June): 1–11. https://doi.org/10.1155/2018/1016384.
Chen, LiJuan, and Hanbin Luo. 2014. ‘A BIM-Based Construction Quality Management Model and Its Applications’. Automation in Construction 46 (October): 64–73. https://doi.org/10.1016/j.autcon.2014.05.009.
Chen, Po-Han, and Thanh Chuong Nguyen. 2019. ‘A BIM-WMS Integrated Decision Support Tool for Supply Chain Management in Construction’. Automation in Construction 98 (February): 289–301. https://doi.org/10.1016/j.autcon.2018.11.019.
Cheng, Eddie W.L., H. Li, D.P. Fang, and F. Xie. 2004. ‘Construction Safety Management: An Exploratory Study from China’. Construction Innovation 4 (4): 229–41. https://doi.org/10.1108/14714170410815114.
Chin, Lok Siew, and Abdul Rahim Abdul Hamid. 2015. The Practice of Time Management on Construction Project. Procedia Engineering. Vol. 125. https://doi.org/10.1016/j.proeng.2015.11.006.
Curtis Harrison. 2014. ‘BIM IMPLEMENTATION IN A NEW ZEALAND CONSULTING QUANTITY SURVEYING PRACTICE’. International Journal of Construction Supply Chain Management 5 (1): 1–15. https://doi.org/10.14424/ijcscm501015-01-15.
Davies, Kathryn. 2016. ‘Soft Skill Requirements in a BIM Project Team’. https://doi.org/10.1108/.
Dubois, Anna, Kajsa Hulthén, and Viktoria Sundquist. 2019. ‘Organising Logistics and Transport Activities in Construction’. The International Journal of Logistics Management, January. https://doi.org/10.1108/IJLM-12-2017-0325.
Durdyev, Serdar, and Jasper Mbachu. 2011. ‘On-Site Labour Productivity of New Zealand Construction Industry: Key Constraints and Improvement Measures’. Construction Economics and Building 11 (3): 18–33. https://doi.org/10.5130/AJCEB.v11i3.2120.
Ejohwomu, Obuks Augustine, Olalekan Shamsideen Oshodi, and Ka Chi Lam. 2017. ‘Nigeria’s Construction Industry: Barriers to Effective Communication’. Engineering, Construction and Architectural Management 24 (4): 652–67. https://doi.org/10.1108/ECAM-01-2016-0003.
Hajikazemi, Sara, Bjørn Andersen, and Jan Alexander Langlo. 2017. ‘Analyzing Electrical Installation Labor Productivity through Work Sampling’. International Journal of Productivity and Performance Management 66 (4): 539–53. https://doi.org/10.1108/IJPPM-06-2016-0122.
Heravi, Amirhossein, Vaughan Coffey, and Bambang Trigunarsyah. 2015. ‘Evaluating the Level of Stakeholder Involvement during the Project Planning Processes of Building Projects’. International Journal of Project Management 33 (5): 985–97. https://doi.org/10.1016/j.ijproman.2014.12.007.
Irizarry, Javier, Ebrahim P. Karan, and Farzad Jalaei. 2013. ‘Integrating BIM and GIS to Improve the Visual Monitoring of Construction Supply Chain Management’. Automation in Construction 31 (May): 241–54. https://doi.org/10.1016/j.autcon.2012.12.005.
Josephson, Per-Erik, and Lasse Björkman. 2013. ‘Why Do Work Sampling Studies in Construction? The Case of Plumbing Work in Scandinavia’. Engineering, Construction and Architectural Management 20 (6): 589–603. https://doi.org/10.1108/ECAM-12-2011-0108.
Kang, Leen Seok, Hyeon Seung Kim, Hyoun Seok Moon, and Sung-Keun Kim. 2016. ‘Managing Construction Schedule by Telepresence: Integration of Site Video Feed with an Active nD CAD Simulation’. Automation in Construction 68 (August): 32–43. https://doi.org/10.1016/j.autcon.2016.04.003.
Kenley, Russell. 2014. ‘Productivity Improvement in the Construction Process’. Construction Management and Economics 32 (6): 489–94. https://doi.org/10.1080/01446193.2014.930500.
Limsila, Kedsuda, and Stephen O. Ogunlana. 2008. ‘Performance and Leadership Outcome Correlates of Leadership Styles and Subordinate Commitment’. Engineering, Construction and Architectural Management 15 (2): 164–84. https://doi.org/10.1108/09699980810852682.
Liu, Hexu, Mohamed Al-Hussein, and Ming Lu. 2015. ‘BIM-Based Integrated Approach for Detailed Construction Scheduling under Resource Constraints’. Automation in Construction 53 (May): 29–43. https://doi.org/10.1016/j.autcon.2015.03.008.
Low, Sui Pheng and SpringerLink (Online service). 2018. Project Management for the Built Environment: Study Notes. Singapore: Springer Singapore. https://doi.org/10.1007/978-981-10-6992-5.
Lu, Qiqi, Jongsung Won, and Jack C.P. Cheng. 2016. ‘A Financial Decision Making Framework for Construction Projects Based on 5D Building Information Modeling (BIM)’. International Journal of Project Management 34 (1): 3–21. https://doi.org/10.1016/j.ijproman.2015.09.004.
Ma, Zhiliang, Shiyao Cai, Na Mao, Qiliang Yang, Junguo Feng, and Pengyi Wang. 2018. ‘Construction Quality Management Based on a Collaborative System Using BIM and Indoor Positioning’. Automation in Construction 92 (August): 35–45. https://doi.org/10.1016/j.autcon.2018.03.027.
Meng, Xianhai, and Paul Boyd. 2017. ‘The Role of the Project Manager in Relationship Management’. International Journal of Project Management 35 (5): 717–28. https://doi.org/10.1016/j.ijproman.2017.03.001.
Nguyen, Luong, and Tsunemi Watanabe. 2017. ‘The Impact of Project Organizational Culture on the Performance of Construction Projects’. Sustainability 9 (5). https://doi.org/10.3390/su9050781.
Oluwole Alfred. n.d. ‘Modelling Organizations Structural Adjustment to BIM Adoption: A Pilot Study on Estimating Organizations’. Journal of Information Technology in Construction (ITcon) 16 (38): 653–68. https://www.itcon.org/paper/2011/38.
Park, Chan-Sik, Do-Yeop Lee, Oh-Seong Kwon, and Xiangyu Wang. 2013. ‘A Framework for Proactive Construction Defect Management Using BIM, Augmented Reality and Ontology-Based Data Collection Template’. Automation in Construction 33 (August): 61–71. https://doi.org/10.1016/j.autcon.2012.09.010.
Park, J. 2016. Field Construction Management Application through Mobile BIM and Location Tracking Technology. ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction. Vol. 33. https://tewaharoa.victoria.ac.nz/primo-explore/fulldisplay?docid=TN_proquest1845793191&context=PC&vid=VUWNUI&lang=en_NZ&search_scope=64VUW_ALL&adaptor=primo_central_multiple_fe&tab=all&query=any,contains,Field%20Construction%20Management%20Application%20through%20Mobile%20BIM%20and%20Location%20TrackingTechnology&sortby=rank&offset=0.
Parn, Erika A., David Edwards, Zainab Riaz, Fahad Mehmood, and Joseph Lai. 2019. ‘Engineering-out Hazards: Digitising the Management Working Safety in Confined Spaces’. Facilities 37 (3/4): 196–215. https://doi.org/10.1108/F-03-2018-0039.
Poirier, Erik A., Sheryl Staub-French, and Daniel Forgues. 2015. ‘Measuring the Impact of BIM on Labor Productivity in a Small Specialty Contracting Enterprise through Action-Research’. Automation in Construction 58 (October): 74–84. https://doi.org/10.1016/j.autcon.2015.07.002.
Project Management Institute. 2013. A Guide to the Project Management Body of Knowledge (PMBOK® Guide). 5th edition. Newtown Square, Pennsylvania: Project Management Institute. https://ebookcentral.proquest.com/lib/vuw/detail.action?docID=4603786.
Qureshi, Sheheryar Mohsin, and ChangWook Kang. 2015. ‘Analysing the Organizational Factors of Project Complexity Using Structural Equation Modelling’. International Journal of Project Management 33 (1): 165–76. https://doi.org/10.1016/j.ijproman.2014.04.006.
Rajeh, Mohammed. n.d. ‘Estimating Transaction Costs in the New Zealand Construction Procurement: A Structural Equation Modelling Methodology’. Engineering Construction and Architectural Management 22 (2): 242–67. https://tewaharoa.victoria.ac.nz/primo-explore/fulldisplay?docid=TN_proquest1709745828&context=PC&vid=VUWNUI&lang=en_NZ&search_scope=64VUW_ALL&adaptor=primo_central_multiple_fe&tab=all&query=any,contains,Estimating%20transaction%20costsin%20the%20New%20Zealandconstruction%20procurementA%20structural%20equation%20modelling%20methodology&offset=0.
Ramachandra, Thanuja. 2015. ‘Causes of Payment Problems in the New Zealand Construction Industry’. Construction Economics and Building 15 (1). https://doi.org/10.5130/.
Senaratne, Sepani, and Manori Ruwanpura. 2016. ‘Communication in Construction: A Management Perspective through Case Studies in Sri Lanka’. Architectural Engineering and Design Management 12 (1): 3–18. https://doi.org/10.1080/17452007.2015.1056721.
Singh, Sukhtaj. 2018. ‘The Implementation of Stakeholder Management and Building Information Modelling (BIM) in UK Construction Projects’. https://wlv.openrepository.com/handle/2436/621760.
Streule, Thomas, Nino Miserini, Olin Bartlomé, Michael Klippel, and Borja García de Soto. 2016. ‘Implementation of Scrum in the Construction Industry’. Procedia Engineering 164: 269–76. https://doi.org/10.1016/j.proeng.2016.11.619.
Tabassi, Amin Akhavan, Aldrin Abdullah, and David James Bryde. 2019. ‘Conflict Management, Team Coordination, and Performance Within Multicultural Temporary Projects: Evidence From the Construction Industry’. Project Management Journal 50 (1): 101–14. https://doi.org/10.1177/8756972818818257.
Toor, Shamas-Ur-Rehman. n.d. ‘Leadership for Future Construction Industry: Agenda for Authentic Leadership’. International Journal of Project Management 26 (6). https://doi.org/10.1016/.
Wei, Yihui, and Stefano Miraglia. 2017. ‘Organizational Culture and Knowledge Transfer in Project-Based Organizations: Theoretical Insights from a Chinese Construction Firm’. International Journal of Project Management 35 (4): 571–85. https://doi.org/10.1016/j.ijproman.2017.02.010.
Ying, J. Fei, John Tookey, and Johannes Roberti. 2015. ‘SCM Competencies in Construction: Issues and Challenges in New Zealand’. Journal of Engineering, Design and Technology 13 (4): 522–38. https://doi.org/10.1108/JEDT-01-2013-0002.
Zareei, Samira. 2018. ‘Project Scheduling for Constructing Biogas Plant Using Critical Path Method’. Renewable and Sustainable Energy Reviews 81 (January): 756–59. https://doi.org/10.1016/j.rser.2017.08.025.
Zhao, Xianbo, Yingbin Feng, Josua Pienaar, and Darryl O’Brien. 2017. ‘Modelling Paths of Risks Associated with BIM Implementation in Architectural, Engineering and Construction Projects’. Architectural Science Review 60 (6): 472–82. https://doi.org/10.1080/00038628.2017.1373628.
Zhong, Ray Y., Yi Peng, Fan Xue, Ji Fang, Weiwu Zou, Hao Luo, S. Thomas Ng, Weisheng Lu, Geoffrey Q.P. Shen, and George Q. Huang. 2017. ‘Prefabricated Construction Enabled by the Internet-of-Things’. Automation in Construction 76 (April): 59–70. https://doi.org/10.1016/j.autcon.2017.01.006.
Zou, Yang, Arto Kiviniemi, Stephen W. Jones, and James Walsh. 2019. ‘Risk Information Management for Bridges by Integrating Risk Breakdown Structure into 3D/4D BIM’. KSCE Journal of Civil Engineering 23 (2): 467–80. https://doi.org/10.1007/s12205-018-1924-3.