Adafin, J., Rotimi, J. O. B., & Wilkinson, S. (2015). Why do the design stage elemental cost plan and final tender sum differ in New Zealand? Journal of Financial Management of Property and Construction, 20(2), 116–131. https://doi.org/10.1108/JFMPC-08-2014-0016
Adafin, J., Rotimi, J. O. B., & Wilkinson, S. (2018). Risk impact assessments in project budget development: quantity surveyors’ perspectives. International Journal of Construction Management, 1–16. https://doi.org/10.1080/15623599.2018.1462441
Ahmad, Z., Thaheem, M. J., & Maqsoom, A. (2018). Building information modeling as a risk transformer: An evolutionary insight into the project uncertainty. Automation in Construction, 92, 103–119. https://doi.org/10.1016/j.autcon.2018.03.032
Al Nahyan, M. T., Sohal, A., Hawas, Y., & Fildes, B. (2019). Communication, coordination, decision-making and knowledge-sharing: a case study in construction management. Journal of Knowledge Management. https://doi.org/10.1108/JKM-08-2018-0503
Alreshidi, E., Mourshed, M., & Rezgui, Y. (2017). Factors for effective BIM governance. Journal of Building Engineering, 10, 89–101. https://doi.org/10.1016/j.jobe.2017.02.006
Arditi, D., Nayak, S., & Damci, A. (2017). Effect of organizational culture on delay in construction. International Journal of Project Management, 35(2), 136–147. https://doi.org/10.1016/j.ijproman.2016.10.018
Bourne, L., & Walker, D. H. T. (2008). Project relationship management and the Stakeholder CircleTM. International Journal of Managing Projects in Business, 1(1), 125–130. https://doi.org/10.1108/17538370810846450
Chang, T., Hwang, B.-G., Deng, X., & Zhao, X. (2018). Identifying Political Risk Management Strategies in International Construction Projects. Advances in Civil Engineering, 2018, 1–11. https://doi.org/10.1155/2018/1016384
Chen, L., & Luo, H. (2014). A BIM-based construction quality management model and its applications. Automation in Construction, 46, 64–73. https://doi.org/10.1016/j.autcon.2014.05.009
Chen, P.-H., & Nguyen, T. C. (2019). A BIM-WMS integrated decision support tool for supply chain management in construction. Automation in Construction, 98, 289–301. https://doi.org/10.1016/j.autcon.2018.11.019
Cheng, E. W. L., Li, H., Fang, D. P., & Xie, F. (2004). Construction safety management: an exploratory study from China. Construction Innovation, 4(4), 229–241. https://doi.org/10.1108/14714170410815114
Chin, L. S., & Hamid, A. R. A. (2015). The Practice of Time Management on Construction Project. In Procedia Engineering (Vol. 125, pp. 32–39). https://doi.org/10.1016/j.proeng.2015.11.006
Curtis Harrison. (2014). BIM IMPLEMENTATION IN A NEW ZEALAND CONSULTING QUANTITY SURVEYING PRACTICE. International Journal of Construction Supply Chain Management, 5(1), 1–15. https://doi.org/10.14424/ijcscm501015-01-15
Davies, Kathryn. (2016). Soft skill requirements in a BIM project team. https://doi.org/10.1108/
Dubois, A., Hulthén, K., & Sundquist, V. (2019). Organising logistics and transport activities in construction. The International Journal of Logistics Management. https://doi.org/10.1108/IJLM-12-2017-0325
Durdyev, S., & Mbachu, J. (2011). On-site Labour Productivity of New Zealand Construction Industry: Key Constraints and Improvement Measures. Construction Economics and Building, 11(3), 18–33. https://doi.org/10.5130/AJCEB.v11i3.2120
Ejohwomu, O. A., Oshodi, O. S., & Lam, K. C. (2017). Nigeria’s construction industry: barriers to effective communication. Engineering, Construction and Architectural Management, 24(4), 652–667. https://doi.org/10.1108/ECAM-01-2016-0003
Hajikazemi, S., Andersen, B., & Langlo, J. A. (2017). Analyzing electrical installation labor productivity through work sampling. International Journal of Productivity and Performance Management, 66(4), 539–553. https://doi.org/10.1108/IJPPM-06-2016-0122
Heravi, A., Coffey, V., & Trigunarsyah, B. (2015). Evaluating the level of stakeholder involvement during the project planning processes of building projects. International Journal of Project Management, 33(5), 985–997. https://doi.org/10.1016/j.ijproman.2014.12.007
Irizarry, J., Karan, E. P., & Jalaei, F. (2013). Integrating BIM and GIS to improve the visual monitoring of construction supply chain management. Automation in Construction, 31, 241–254. https://doi.org/10.1016/j.autcon.2012.12.005
Josephson, P.-E., & Björkman, L. (2013). Why do work sampling studies in construction? The case of plumbing work in Scandinavia. Engineering, Construction and Architectural Management, 20(6), 589–603. https://doi.org/10.1108/ECAM-12-2011-0108
Kang, L. S., Kim, H. S., Moon, H. S., & Kim, S.-K. (2016). Managing construction schedule by telepresence: Integration of site video feed with an active nD CAD simulation. Automation in Construction, 68, 32–43. https://doi.org/10.1016/j.autcon.2016.04.003
Kenley, R. (2014). Productivity improvement in the construction process. Construction Management and Economics, 32(6), 489–494. https://doi.org/10.1080/01446193.2014.930500
Limsila, K., & Ogunlana, S. O. (2008). Performance and leadership outcome correlates of leadership styles and subordinate commitment. Engineering, Construction and Architectural Management, 15(2), 164–184. https://doi.org/10.1108/09699980810852682
Liu, H., Al-Hussein, M., & Lu, M. (2015). BIM-based integrated approach for detailed construction scheduling under resource constraints. Automation in Construction, 53, 29–43. https://doi.org/10.1016/j.autcon.2015.03.008
Low, S. P. & SpringerLink (Online service). (2018). Project Management for the Built Environment: Study Notes. Springer Singapore. https://doi.org/10.1007/978-981-10-6992-5
Lu, Q., Won, J., & Cheng, J. C. P. (2016). A financial decision making framework for construction projects based on 5D Building Information Modeling (BIM). International Journal of Project Management, 34(1), 3–21. https://doi.org/10.1016/j.ijproman.2015.09.004
Ma, Z., Cai, S., Mao, N., Yang, Q., Feng, J., & Wang, P. (2018). Construction quality management based on a collaborative system using BIM and indoor positioning. Automation in Construction, 92, 35–45. https://doi.org/10.1016/j.autcon.2018.03.027
Meng, X., & Boyd, P. (2017). The role of the project manager in relationship management. International Journal of Project Management, 35(5), 717–728. https://doi.org/10.1016/j.ijproman.2017.03.001
Nguyen, L., & Watanabe, T. (2017). The Impact of Project Organizational Culture on the Performance of Construction Projects. Sustainability, 9(5). https://doi.org/10.3390/su9050781
Oluwole Alfred. (n.d.). Modelling organizations structural adjustment to BIM adoption: a pilot study on estimating organizations. Journal of Information Technology in Construction (ITcon), 16(38), 653–668. https://www.itcon.org/paper/2011/38
Park, C.-S., Lee, D.-Y., Kwon, O.-S., & Wang, X. (2013). A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template. Automation in Construction, 33, 61–71. https://doi.org/10.1016/j.autcon.2012.09.010
Park, J. (2016). Field Construction Management Application through Mobile BIM and Location Tracking Technology. In ISARC. Proceedings of the International Symposium on Automation and Robotics in Construction (Vol. 33). https://tewaharoa.victoria.ac.nz/primo-explore/fulldisplay?docid=TN_proquest1845793191&context=PC&vid=VUWNUI&lang=en_NZ&search_scope=64VUW_ALL&adaptor=primo_central_multiple_fe&tab=all&query=any,contains,Field%20Construction%20Management%20Application%20through%20Mobile%20BIM%20and%20Location%20TrackingTechnology&sortby=rank&offset=0
Parn, E. A., Edwards, D., Riaz, Z., Mehmood, F., & Lai, J. (2019). Engineering-out hazards: digitising the management working safety in confined spaces. Facilities, 37(3/4), 196–215. https://doi.org/10.1108/F-03-2018-0039
Poirier, E. A., Staub-French, S., & Forgues, D. (2015). Measuring the impact of BIM on labor productivity in a small specialty contracting enterprise through action-research. Automation in Construction, 58, 74–84. https://doi.org/10.1016/j.autcon.2015.07.002
Project Management Institute. (2013). A guide to the project management body of knowledge (PMBOK® guide) (5th edition). Project Management Institute. https://ebookcentral.proquest.com/lib/vuw/detail.action?docID=4603786
Qureshi, S. M., & Kang, C. (2015). Analysing the organizational factors of project complexity using structural equation modelling. International Journal of Project Management, 33(1), 165–176. https://doi.org/10.1016/j.ijproman.2014.04.006
Rajeh, Mohammed. (n.d.). Estimating transaction costs in the New Zealand construction procurement: A structural equation modelling methodology. Engineering Construction and Architectural Management, 22(2), 242–267. https://tewaharoa.victoria.ac.nz/primo-explore/fulldisplay?docid=TN_proquest1709745828&context=PC&vid=VUWNUI&lang=en_NZ&search_scope=64VUW_ALL&adaptor=primo_central_multiple_fe&tab=all&query=any,contains,Estimating%20transaction%20costsin%20the%20New%20Zealandconstruction%20procurementA%20structural%20equation%20modelling%20methodology&offset=0
Ramachandra, Thanuja. (2015). Causes of payment problems in the New Zealand construction industry. Construction Economics and Building, 15(1). https://doi.org/10.5130/
Senaratne, S., & Ruwanpura, M. (2016). Communication in construction: a management perspective through case studies in Sri Lanka. Architectural Engineering and Design Management, 12(1), 3–18. https://doi.org/10.1080/17452007.2015.1056721
Singh, Sukhtaj. (2018). The Implementation of Stakeholder Management and Building Information Modelling (BIM) in UK Construction Projects. https://wlv.openrepository.com/handle/2436/621760
Streule, T., Miserini, N., Bartlomé, O., Klippel, M., & de Soto, B. G. (2016). Implementation of Scrum in the Construction Industry. Procedia Engineering, 164, 269–276. https://doi.org/10.1016/j.proeng.2016.11.619
Tabassi, A. A., Abdullah, A., & Bryde, D. J. (2019). Conflict Management, Team Coordination, and Performance Within Multicultural Temporary Projects: Evidence From the Construction Industry. Project Management Journal, 50(1), 101–114. https://doi.org/10.1177/8756972818818257
Toor, Shamas-Ur-Rehman. (n.d.). Leadership for future construction industry: Agenda for authentic leadership. International Journal of Project Management, 26(6). https://doi.org/10.1016/
Wei, Y., & Miraglia, S. (2017). Organizational culture and knowledge transfer in project-based organizations: Theoretical insights from a Chinese construction firm. International Journal of Project Management, 35(4), 571–585. https://doi.org/10.1016/j.ijproman.2017.02.010
Ying, J. F., Tookey, J., & Roberti, J. (2015). SCM competencies in construction: issues and challenges in New Zealand. Journal of Engineering, Design and Technology, 13(4), 522–538. https://doi.org/10.1108/JEDT-01-2013-0002
Zareei, S. (2018). Project scheduling for constructing biogas plant using critical path method. Renewable and Sustainable Energy Reviews, 81, 756–759. https://doi.org/10.1016/j.rser.2017.08.025
Zhao, X., Feng, Y., Pienaar, J., & O’Brien, D. (2017). Modelling paths of risks associated with BIM implementation in architectural, engineering and construction projects. Architectural Science Review, 60(6), 472–482. https://doi.org/10.1080/00038628.2017.1373628
Zhong, R. Y., Peng, Y., Xue, F., Fang, J., Zou, W., Luo, H., Thomas Ng, S., Lu, W., Shen, G. Q. P., & Huang, G. Q. (2017). Prefabricated construction enabled by the Internet-of-Things. Automation in Construction, 76, 59–70. https://doi.org/10.1016/j.autcon.2017.01.006
Zou, Y., Kiviniemi, A., Jones, S. W., & Walsh, J. (2019). Risk Information Management for Bridges by Integrating Risk Breakdown Structure into 3D/4D BIM. KSCE Journal of Civil Engineering, 23(2), 467–480. https://doi.org/10.1007/s12205-018-1924-3