B. S. K. Reddy (no date) ‘A STUDY ON OPTIMISATION OF RESOURCES FOR MULTIPLE PROJECTS BY USING PRIMAVERA’, Journal of Engineering Science and Technology, 10(2), pp. 235–248. Available at: https://tewaharoa.victoria.ac.nz/primo-explore/fulldisplay?vid=VUWNUI&search_scope=64VUW_ALL&tab=all&docid=TN_doaj_soai_doaj_org_article_5f2b93196182421bb8ea4b771f43c913&lang=en_NZ&context=PC&adaptor=primo_central_multiple_fe&query=any,contains,A%20Study%20on%20Optimization%20of%20Resources%20for%20Multiple%20Projects%20By%20Using%20Primavera&offset=0&pcAvailability=true.
‘Beyond the clash: Investigating BIM-based building design coordination issue representation and resolution’ (no date). Available at: https://tewaharoa.victoria.ac.nz/primo-explore/search?query=any,contains,BEYOND%20THE%20CLASH:%20INVESTIGATINGBIM-BASED%20BUILDING%20DESIGN%20COORDINATION%20ISSUE%20REPRESENTATION%20AND%20RESOLUTION&tab=all&search_scope=64VUW_ALL&vid=VUWNUI&lang=en_NZ&offset=0.
Borrmann, A. et al. (2018) ‘Building Information Modeling: Why? What? How?’, in A. Borrmann et al. (eds) Building Information Modeling. Cham: Springer International Publishing, pp. 1–24. Available at: https://doi.org/10.1007/978-3-319-92862-3_1.
Caulfield, John (no date) ‘Can Digital Twin make project management more efficient?’, Building Design & Construction [Preprint]. Available at: https://tewaharoa.victoria.ac.nz/primo-explore/fulldisplay?docid=TN_proquest2213989492&context=PC&vid=VUWNUI&lang=en_NZ&search_scope=64VUW_ALL&adaptor=primo_central_multiple_fe&tab=all&query=any,contains,digital%20twin%20and%20construction%20management&offset=0.
Li, C.Z. et al. (2018) ‘An Internet of Things-enabled BIM platform for on-site assembly services in prefabricated construction’, Automation in Construction, 89, pp. 146–161. Available at: https://doi.org/10.1016/j.autcon.2018.01.001.
Project Management Institute (2006) Practice Standard for Work Breakdown Structures - Second Edition. Project Management Institute. Available at: https://learning.oreilly.com/library/view/practice-standard-for/9781935589464/.
Project Management Institute (2011) Practice standard for earned value management. Newtown Square, Pa: Project Management Institute.
Project Management Institute (2019) Practice Standard for Scheduling - Third Edition. Project Management Institute. Available at: https://learning.oreilly.com/library/view/practice-standard-for/9781628255621/.
ProQuest (Firm) (2013) A guide to the project management body of knowledge (PMBOK® guide). 5th edition. Newtown Square, Pennsylvania: Project Management Institute. Available at: http://ebookcentral.proquest.com/lib/VUW/detail.action?docID=4603786.
Scheffer, M., Mattern, H. and König, M. (2018) ‘BIM Project Management’, in A. Borrmann et al. (eds) Building Information Modeling. Cham: Springer International Publishing, pp. 235–249. Available at: https://doi.org/10.1007/978-3-319-92862-3_13.
T. Subramani (no date) ‘Planning and Scheduling of High Rise Building Using Primavera’, International Journal of Engineering Research and Applications, 4(6), pp. 134–144. Available at: https://tewaharoa.victoria.ac.nz/primo-explore/fulldisplay?docid=TN_doaj_soai_doaj_org_article_403216ca16554858b93d40b0fce29fd9&context=PC&vid=VUWNUI&lang=en_NZ&search_scope=64VUW_ALL&adaptor=primo_central_multiple_fe&tab=all&query=any,contains,panning%20and%20Scheduling%20of%20High%20Rise%20Building%20Using%20Primavera&offset=0&pcAvailability=true.